Removal of props under
slabs spanning upto 4.5 m is 7 days
slabs spanning more than 4.5 m is 14 days
beams spanning upto 6 m is 14 days
beams spanning more than 6 m is 21 days
all the above.
Show Answer
Correct Answer:
all the above.