In case of cement concrete pavements, pick up the incorrect statement
tractive resistance is low
initial cost of construction is high
initial cost of construction is low
visibility during nights is high
none of these.
Correct Answer:
initial cost of construction is low
← Previous Question
Next Question→
More Questions from
Highway Engineering
In a braking test, a vehicle travelling at 36 km ph was stopped at a braking distance of 8.0 m. The average value of the vehicle's skid resistance (friction coefficient) is
If V is the velocity in km.p.h., t the brake reaction time in seconds and η the efficiency of the brakes, the stopping distance S of the vehicle, is
Minimum number of 50 kg cement bags per cubic metre of concrete for a mix corresponding to crushing strength 280 kg/cm2 at 28 days, are
Reference pillars fixed on the centre line of a proposed road, provide the following information:
If the elevations along a road increase, the slope of the road along the longitudinal direction, is known as
Concrete pavement is provided if daily traffic per lane exceeds
If R is the radius of a main circular curve, Δ is the angle of deflection and α is the polar deflection angle of any point, its radial distance is
Non-passing sight distance along a road is the longest distance at which the driver of a moving vehicle, may see an obstacle on the pavement
According to Indian Road Congress, the width of carriageway, is
The minimum superelevation in rolling terrain in plains, is limited to
Discussion & Comments
No comments yet. Be the first to comment!
Name:
Comment:
Post Comment
Join Discussion
Discussion & Comments