Both architect and engineer make use of the cost estimate of the project:
for site selection
for designing of the project
for choosing alternatives
All of these
Correct Answer:
All of these
← Previous Question
Next Question→
More Questions from
Engineering Economy
Ratio analysis of a construction firm is used for analysis by :
If a is the base amount expenditure, b is the increase in the operation cost each year over a period of n years, the total cost of maintenance is :
Present worth Annuity (PWA) is generally known as
The construction estimate of a project is used by :
A construction estimate is used
In a cash-flow diagram :
Pick up the correct statement from the following:
The product of CAF (S P) and PWF (S P) is:
Which one of the following definitions, is correct?
The more critical (or severe) test of the firm's liquidity can be judged by :
Discussion & Comments
No comments yet. Be the first to comment!
Name:
Comment:
Post Comment
Join Discussion
Discussion & Comments