The operation of removing humps and hollows of uniform concrete surface, is known as
floating
screeding
trowelling
finishing
none of these.
Correct Answer:
screeding
← Previous Question
Next Question→
More Questions from
Concrete Technology
Pick up the correct statement from the following:
The aggregate containing moisture in pores and having its suface dry, is known as
The commercial name of white and coloured cement in India, is
If the engineer-in-charge approves, the 10 cm cubes may be used for the work test of concrete provided maximum nominal size of aggregate, does not exceed
Pick up the correct statement from the following:
Pick up the correct statement from the following:
For the construction of R.C.C. slabs, columns, beams, walls, etc. the grade of concrete mix used, is
Slump test of concrete is a measure ofits
The void ratio of
The condition not applicable to water cement ratio law, is
Discussion & Comments
No comments yet. Be the first to comment!
Name:
Comment:
Post Comment
Join Discussion
Discussion & Comments