The process of keeping concrete moist for a certain period after its finishing, is known as
finishing of concrete
curing of concrete
placing of concrete
compaction of concrete
none of these.
Correct Answer:
curing of concrete
← Previous Question
Next Question→
More Questions from
Building Construction
Dutch bond is a modification of
Bearing capacity of soils cannot be improved by
The dimensions of a half queen closer, are
In case of foundations on sandy soil, maximum permissible differential settlement, is usually limited to
The lower half portion between crown and skew back of the arch, is called
The strength of brick masonry in 1:6 cement mortar, is
To support a heavy structure in sandy soil, the type of foundation generally used, is
In grillage foundations a minimum 15 cm cover is provided on
Raft foundations are used for :
Expansion joints in masonry walls are provided if length exceeds
Discussion & Comments
No comments yet. Be the first to comment!
Name:
Comment:
Post Comment
Join Discussion
Discussion & Comments