Pick up the incorrect statement from the following :
Horizontal D.P.C. is provided at plinth level in internal walls
D.P.C. is provided under door and verandah openings
Vertical D.P.C. is not provided in internal walls
Cement concrete is a rigid damp-proofing material.
Correct Answer:
D.P.C. is provided under door and verandah openings
← Previous Question
Next Question→
More Questions from
Building Construction
Pick up the incorrect statement from the following :
Crown is located at
In soils possessing low bearing capacity, the type of foundation generally provided, is
Stability of an existing structure may be disturbed by
Pick up the correct statement from the following :
A floor constructed with the 4 to 6 mm marble chips, is known
Pick up the correct statement from the following :
Pick up the correct statement from the following :
The local swelling of a finished plaster, is termed
The voussoir placed at crown of an arch, is known as a