Pick up the correct statement from the following :
the sand in the sand pile is well compacted
the sand is kept moist at the time of placing and tamping
the top one metre of the pile is filled up with cement concrete to provide a cap for the filled up sand
sand piles are generally used under column loads
all of the above.
Correct Answer:
all of the above.
← Previous Question
Next Question→
More Questions from
Building Construction
The depth of concrete bed of the foundation depends upon
If a is the offset of concrete bed in cms, and d is the depth of concrete bed in cms, then
The depth of excavation of foundations, is generally measured with a
A cut in frame of a door to receive the shutter, is called
Negative skin friction
If the depth of an excavation is 20 metres, number of single stage well points to be installed at various levels, is
A covering of concrete placed on the exposed top of an external wall, is known as
The minimum distance between the centres of bulb of diameter du, of a multi under reamed piles, is
Ornamental moulded course placed on the top of a wall, is
The type of stone masonry in which stones of same height are laid in layers, is called