If the depth of an excavation is 20 metres, number of single stage well points to be installed at various levels, is
5
4
3
2
6.
Correct Answer:
3
← Previous Question
Next Question→
More Questions from
Building Construction
A covering of concrete placed on the exposed top of an external wall, is known as
The minimum distance between the centres of bulb of diameter du, of a multi under reamed piles, is
Ornamental moulded course placed on the top of a wall, is
The type of stone masonry in which stones of same height are laid in layers, is called
Couple roof is used for spans
Nogging of a common wooden partition is
Pile foundation is generally provided if soil is
The stone whose crushing strength is maximum, is
The vertical side member of a shutter frame, is known
The method of moving each brick through a small horizontal distance before it is finally laid in any brick wall and pressing it by means of brick hammer, is known as
Discussion & Comments
No comments yet. Be the first to comment!
Name:
Comment:
Post Comment
Join Discussion
Discussion & Comments