Curioustab
Aptitude
General Knowledge
Verbal Reasoning
Computer Science
Interview
Aptitude
General Knowledge
Verbal Reasoning
Computer Science
Interview
Home
»
Civil Engineering
»
Advanced Surveying
Triangulation surveys are carried out for locating
control points for surveys of large areas
control points for photogrammetric surveys
engineering works, i.e. terminal points of long tunnels, bridge abutments, etc.
all the above.
Correct Answer:
all the above.
← Previous Question
Next Question→
More Questions from
Advanced Surveying
International date line is located along
Accidental errors
The movement of the projector in y-direction, introduces in the model a y-parallax
While making astronomical observations, the observer is mainly concerned with
The angle between the axis of earth and the vertical at the station of observation is called
The stereo plotting instruments are generally manufactured on the principle of
If α, H, A and δ be the altitude, hour angle, azimuth and declination of a circumpolar star at its elongation, in latitude λ, the following relation holds good
If θ and δ be the latitude of a place and declination of a star respectively, the upper culmination of the star will be north of zenith if its zenith distance, is
The shortest distance between two places measured along the surface of the earth, is
The latitude (λ) of a place and the altitude (α) of the pole are related by
Discussion & Comments
No comments yet. Be the first to comment!
Name:
Comment:
Post Comment
Join Discussion
Discussion & Comments