Curioustab
Aptitude
General Knowledge
Verbal Reasoning
Computer Science
Interview
Take Free Test
Aptitude
General Knowledge
Verbal Reasoning
Computer Science
Interview
Take Free Test
Home
»
Technical Drawing
»
Drawing Management
After a drawing has been released, an engineering change order is used to document and approve drawing changes.
True
False
Correct Answer:
True
← Previous Question
Next Question→
More Questions from
Drawing Management
Because electronically stored files can easily be altered, they may not be considered acceptable for documentation.
Individual companies often have their own standards of data management.
It is a good idea to have a single directory in which all employees store work.
Design databases can be used to streamline the design process.
PERT or Gantt charts are used specifically to track time engineering change orders.
To be useful, drawings must be stored electronically in a manner that satisfies the requirements for a static snapshot of the design at the time of release.
Design milestones and reviews help ensure that the design process is timely.
It is important to establish a procedure and name files systematically.
Legal standards for how long engineering drawings need to be retained are standardized in the United States.
Discussion & Comments
No comments yet. Be the first to comment!
Name:
Comment:
Post Comment
Join Discussion
Discussion & Comments