  • Question
  • Halsey plan of wage incentive


  • Options
  • A. is not applied to all level of workers
  • B. is applied to all level of workers
  • C. does not guarantee minimum wage
  • D. is based upon efficiency of worker

  • Correct Answer
  • is applied to all level of workers 


  • Industrial Engineering and Production Management problems


    Search Results


    • 1. Process layout is employed

    • Options
    • A. where low volume of production is required
    • B. where similar jobs are manufactured on similar machines
    • C. where machines are arranged on functional basis
    • D. all of the above
    • Discuss
    • 2. An activity of the project is graphically represented by __________ on the network diagram.

    • Options
    • A. a circle
    • B. a straight line
    • C. an arrow
    • Discuss
    • 3. Normal time is the ratio of representative time to the rating factor.

    • Options
    • A. True
    • B. False
    • Discuss
    • 4. In product layout

    • Options
    • A. specialised and strict supervision is required
    • B. machines can not be used to their maximum capacity
    • C. manufacturing cost rises with a fall in the volume of production
    • D. all of the above
    • Discuss
    • 5. The time taken by a trained worker to perform an operation, while working a steady pace, is known as

    • Options
    • A. standard time
    • B. normal time
    • C. representative time
    • D. none of these
    • Discuss
    • 6. Travel charts are used to

    • Options
    • A. analyse material handling
    • B. determine inventory control difficulties
    • C. plan material handling procedure and routes
    • D. all of the above
    • Discuss
    • 7. If A is the total items consumed per year, P is the procurement cost per order, and C is the annual inventory carrying cost per item, then the most economic ordering quantity is given by

    • Options
    • A.
    • B.
    • C.
    • D.
    • Discuss
    • 8. Linear programming can be applied successfully to

    • Options
    • A. chemical industry
    • B. oil industry
    • C. banks
    • D. all of these
    • Discuss
    • 9. The value engineering technique in which experts of the same rank assemble for product development is called

    • Options
    • A. Delphi
    • B. brain storming
    • C. morphological analysis
    • D. direct expert comparison
    • Discuss
    • 10. PERT

    • Options
    • A. provides an approach for keeping planning up-to-date
    • B. provides a way for management to require that planning be done on a uniform and logical basis
    • C. permits management to foresee quickly the impact of variations from the plan
    • D. all of the above
    • Discuss