logo

CuriousTab

CuriousTab

System Analysis and Design problems


  • 1. Rapid prototyping proves the quality of a design by

  • Options
  • A. having a program simulate the real system
  • B. having the system analyst present an overview of the design to users, programmers, and consultants
  • C. having a data flow diagram
  • D. both (a) and (b)
  • E. None of the above
  • Discuss
  • 2. A channel for communicating across a boundary between two or more sub¬systems is known as

  • Options
  • A. interface
  • B. actigram
  • C. walk through
  • D. data path
  • E. None of the above
  • Discuss
  • 3. What type of software is most useful in financial planning and calculation?

  • Options
  • A. graphics
  • B. communication
  • C. database
  • D. spreadsheet
  • E. None of the above
  • Discuss
  • 4. Branch mark programs are best characterized as

  • Options
  • A. Simulator programs
  • B. Hallmarking
  • C. Actual system programs
  • D. Vendor software for applications
  • E. None of the above
  • Discuss
  • 5. The feasibilities studied in preliminary investigation is (are):

  • Options
  • A. technical feasibility
  • B. economic feasibility
  • C. operational feasibility
  • D. All of the above
  • E. None of the above
  • Discuss
  • 6. Which of the following statements is not true

  • Options
  • A. at example of a hierarchical data structure is tree
  • B. pointers are useful in traversing a linked list
  • C. a checksum digit is used for detecting Errors in data transmission
  • D. All of the above
  • E. None of the above
  • Discuss
  • 7. Which of the following is not a characteristic of a system?

  • Options
  • A. operates for some purpose
  • B. has homogeneous components
  • C. operates within a boundary
  • D. has interacting components
  • E. None of the above
  • Discuss
  • 8. A design that consists of a hierarchy of modules; each module has a single entry and a single exit subroutine, is known as

  • Options
  • A. hierarchy structure
  • B. top-down design
  • C. Tuple
  • D. Turnaround
  • E. None of the above
  • Discuss
  • 9. Which of the following is not a programming control structure?

  • Options
  • A. Repetition
  • B. Selection
  • C. Sequence
  • D. Sorting
  • E. None of the above
  • Discuss
  • 10. On the feasibility committee, department representatives serve as

  • Options
  • A. ready source of information
  • B. liason to their departments
  • C. direct users of the new system
  • D. both (a) and (c)
  • E. None of the above
  • Discuss

First 21 22 23 ... 24 .. 25 26 Last