logo

CuriousTab

CuriousTab

System Analysis and Design problems


  • 1. The system study project includes

  • Options
  • A. system analysis
  • B. system design
  • C. implementation
  • D. both (a) and (b)
  • E. None of the above
  • Discuss
  • 2. Changes made periodically to a system, after its implementation, is known as system

  • Options
  • A. analysis
  • B. design
  • C. development
  • D. maintenance
  • E. none of the above
  • Discuss
  • 3. A common reason for changing an information system is

  • Options
  • A. new requirements
  • B. new technology
  • C. problems in the existing system
  • D. All of the above
  • E. None of the above
  • Discuss
  • 4. Which of the following systems implementation approaches should be used if you want to run the old system and the new system at the same time for a specified period?

  • Options
  • A. direct
  • B. pilot
  • C. phased
  • D. parallel
  • E. None of the above
  • Discuss
  • 5. Conversion method in which users, being used to an old system, continue to use the old system, alongside the new system, is

  • Options
  • A. multi processing
  • B. multitasking
  • C. parallel run
  • D. All of the above
  • E. None of the above
  • Discuss
  • 6. The longest method of conversion is

  • Options
  • A. direct
  • B. parallel
  • C. phased
  • D. pilot
  • E. None of the above
  • Discuss
  • 7. A system investigation may result from

  • Options
  • A. an analysis investigation
  • B. a scheduled systems reviewed
  • C. a manager's formal request
  • D. All of the above
  • E. None of the above
  • Discuss
  • 8. Decision tree uses

  • Options
  • A. pictorial depiction of alternate conditions
  • B. nodes and branches
  • C. consequences of various depicted alternates
  • D. All of the above
  • E. None of the above
  • Discuss
  • 9. Which of the following is not an advantage of the structured approach to system development?

  • Options
  • A. it focuses on the physical aspects of the system
  • B. the system specification is very graphic
  • C. the user area is studied thoroughly
  • D. the documentation is Cumulative
  • E. None of the above
  • Discuss
  • 10. Requirements also serve as an evaluation checklist at the end of the development project, so they are sometimes called _____.

  • Options
  • A. System Development Life Cycle
  • B. CASE tool
  • C. Phased Conversion
  • D. Success factors
  • E. Move of the above.
  • Discuss

First 25 26 Last