logo

CuriousTab

CuriousTab

System Analysis and Design problems


  • 1. The systems conversion technique of totally removing the existing system and immediately implementing the new system is called a

  • Options
  • A. pilot conversion
  • B. crash conversion
  • C. phased conversion
  • D. parallel run
  • E. None of the above
  • Discuss
  • 2. A system design is said to be functionally modular if

  • Options
  • A. the system is able to handle all the function of the application
  • B. each module performs a specific function and can be developed relatively independently by programmers
  • C. the system makes extensive use of function. keys for maximum user assistance
  • D. the system is developed using structured programming through COBOL or PASCAL
  • E. None of the above
  • Discuss
  • 3. In Data structure, main characteristic of "ring" is :

  • Options
  • A. last, record points to the first record
  • B. first record points only to the last record
  • C. many records point to one record
  • D. All of the above
  • E. None of the above
  • Discuss
  • 4. An open rectangle

  • Options
  • A. defines a source or destination of system data
  • B. identifies data flow
  • C. represents a process that transforms incoming data flow(s) into outgoing data flows
  • D. is a data store-data at rest, or a temporary repository of data
  • E. None of the above
  • Discuss
  • 5. Which of the following tools is not used in modeling the new system?

  • Options
  • A. decision tables
  • B. data dictionary
  • C. data-flow diagrams
  • D. All of the above
  • E. None of the above
  • Discuss
  • 6. Which of the following control structures is used in every program?

  • Options
  • A. Repetition
  • B. Selection
  • C. Sequence
  • D. Switching
  • E. None of the above
  • Discuss
  • 7. A programmer reviews the accuracy of an algorithm by _____ it.

  • Options
  • A. Analyzing
  • B. Coding
  • C. Desk-checking
  • D. Planning
  • E. None of the above
  • Discuss
  • 8. The model base cannot be prepared until

  • Options
  • A. the computer has been selected
  • B. the MIS staff has been acquired and organized
  • C. the preparation of physical facilities
  • D. both (a) and (b)
  • E. None of the above
  • Discuss
  • 9. Graphic representation of the control logic of processing functions or modules representing a system, is known as:

  • Options
  • A. Structured analysis
  • B. Structured chart
  • C. Structured English
  • D. System Flow chart
  • E. None of the above
  • Discuss
  • 10. The first step in systems Development Life Cycle is

  • Options
  • A. database design
  • B. system design
  • C. preliminary investigation and analysis
  • D. graphical user interface
  • E. None of the above
  • Discuss

First 23 24 25 ... .. 26 Last