  • 1. The cross-sectional area of the embankment of a canal fully in embankment in the given figure is
    Civil Engineering Estimating and Costing: The cross-sectional area of the embankment of a canal fully in embankment in the given figure is

  • Options
  • A. ½ (b₁ + b₂) h
  • B. (b₁ + b₂) h + sb²
  • C. (b₁ + b₂) + 2sh²
  • D. 2 [(b₁ + b₂) (b + sh²)]
  • Discuss
  • 2. Referring of given figure, pick up the correct statement from the following:
    Civil Engineering Estimating and Costing: Referring of given figure, pick up the correct statement from the following:

  • Options
  • A. The total length of centre line of four walls is 20 m
  • B. Length of long wall out-to-out is 6.80 m
  • C. Length of short walls in-to-in is 3.20 m
  • D. All the above.
  • Discuss
  • 3. Size, capacity and materials need be specified for

  • Options
  • A. Bib-cocks
  • B. Stop-cocks
  • C. Ferrules
  • D. Ball valves
  • E. All the above.
  • Discuss
  • 4. Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds

  • Options
  • A. 2.0%
  • B. 2.5%
  • C. 4.0%
  • D. 5.0%
  • Discuss
  • 5. Pick up the correct statement regarding the centre line method of estimating a building

  • Options
  • A. Product of the centre line of the walls and area of cross-section of any item, gives total quantity of the item
  • B. The centre line is worked out separately for different sections of walls of a building
  • C. The centre line length is reduced by half the layer of main wall joining the partition wall
  • D. All the above.
  • Discuss
  • 6. The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended

  • Options
  • A. 100 mm
  • B. 150 mm
  • C. 200 mm
  • D. 175 mm
  • Discuss
  • 7. The measurement is made for stone work in square metre in case of

  • Options
  • A. Wall facing
  • B. Columns, lintels, copings
  • C. Building work
  • D. Dressed stones in Chajjas
  • E. (a) and (d) of the above.
  • Discuss
  • 8. For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is

  • Options
  • A. 0.90 m3
  • B. 0.94 m3
  • C. 0.98 m3
  • D. 1.00 m3
  • Discuss
  • 9. The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by prismoidal formula, is

  • Options
  • A. 3250 m3
  • B. 3225 m3
  • C. 3275 m3
  • D. 3300 m3
  • Discuss
  • 10. Pick up the correct statement from the following:

  • Options
  • A. Pointing is measured in sq.m
  • B. Plastering is measured in sq.m
  • C. Glazing is measured in sq.m
  • D. Striking is measured in sq.m
  • E. All the above.
  • Discuss