Work sampling is applied for
estimation of the percentage utilisation of machine tools
estimating the percentage of the time consumed by various job activities
finding out time standards, specially where the job is not repetitive and where time study by stop watch method is not possible
all of the above
Correct Answer:
all of the above
← Previous Question
Next Question→
More Questions from
Industrial Engineering and Production Management
Queuing theory is associated with
The type of organisation preferred for a steel industry, is
Production cost refers to prime cost plus
The determination of standard time in a complex job system is best done through
In a network shown in the below figure, the critical path is along
Fixed position layout is also known as
PERT is an event oriented technique.
Line organisation is suitable for a big organisation.
Direct expenses include
Probabilistic time for completion of any activity can be found out from