In time study, the rating factor is applied to determine
standard time of a job
merit rating of the worker
fixation of incentive rate
normal time of a worker
Correct Answer:
normal time of a worker
← Previous Question
Next Question→
More Questions from
Industrial Engineering and Production Management
The product layout is more amenable to automation than process layout.
The chart which gives an estimate about the amount of materials handling between various work stations is known as
Simplex method is the method used for
Which of the following statement is correct?
Work sampling is applied for
Queuing theory is associated with
The type of organisation preferred for a steel industry, is
Production cost refers to prime cost plus
The determination of standard time in a complex job system is best done through
In a network shown in the below figure, the critical path is along
Discussion & Comments
No comments yet. Be the first to comment!
Name:
Comment:
Post Comment
Join Discussion
Discussion & Comments