Energy infrastructure (GAIL HBJ pipeline): To what capacity was the Hazira–Vijaipur–Jagdishpur (HBJ) gas pipeline upgraded? Original rated capacity = 18.2 MMSCMD (million standard cubic metres per day). Choose the correct upgraded capacity value.
General Knowledge
World Geography
Difficulty: Easy
Choose an option
-
A20.0 MMSCMD
-
B33.4 MMSCMD
-
C22.3 MMSCMD
-
D29.6 MMSCMD
Answer
Correct Answer: 33.4 MMSCMD
Explanation
Given data
- HBJ pipeline original capacity = 18.2 MMSCMD.
- Asked: Upgraded capacity after the HBJ Upgradation Project.
Concept/ApproachCapacity upgrades on trunk gas pipelines are reported in MMSCMD (million standard cubic metres per day). The well-known HBJ revamp raised throughput significantly above 18.2.
Step-by-step reasoning• Compare plausible increments: +1.8 (to 20.0), +4.1 (to 22.3), +11.4 (to 29.6), +15.2 (to 33.4).• Documented upgrade brought the line into the low-30s MMSCMD class → 33.4 MMSCMD.
Verification/AlternativeIndustry sources and standard GK references list HBJ's post-upgradation throughput at ~33.4 MMSCMD.
Common pitfallsRounding to a nearby figure (≈30) instead of recalling the exact upgraded rating (33.4).
Final Answer33.4 MMSCMD