Energy infrastructure (GAIL HBJ pipeline): To what capacity was the Hazira–Vijaipur–Jagdishpur (HBJ) gas pipeline upgraded? Original rated capacity = 18.2 MMSCMD (million standard cubic metres per day). Choose the correct upgraded capacity value.

General Knowledge World Geography Difficulty: Easy
Choose an option
  • A
    20.0 MMSCMD
  • B
    33.4 MMSCMD
  • C
    22.3 MMSCMD
  • D
    29.6 MMSCMD

Answer

Correct Answer: 33.4 MMSCMD

Explanation

Given data

  • HBJ pipeline original capacity = 18.2 MMSCMD.
  • Asked: Upgraded capacity after the HBJ Upgradation Project.

Concept/ApproachCapacity upgrades on trunk gas pipelines are reported in MMSCMD (million standard cubic metres per day). The well-known HBJ revamp raised throughput significantly above 18.2.

Step-by-step reasoning• Compare plausible increments: +1.8 (to 20.0), +4.1 (to 22.3), +11.4 (to 29.6), +15.2 (to 33.4).• Documented upgrade brought the line into the low-30s MMSCMD class → 33.4 MMSCMD.

Verification/AlternativeIndustry sources and standard GK references list HBJ's post-upgradation throughput at ~33.4 MMSCMD.

Common pitfallsRounding to a nearby figure (≈30) instead of recalling the exact upgraded rating (33.4).

Final Answer33.4 MMSCMD

Discussion & Comments
No comments yet. Be the first to comment!
Join Discussion