According to the formula.
Required time = (x + y)/(u - v)
Here , x = 50 m , y = 65 m , u = 18 m/s and v = 17 m/s
? Required time = (50 + 65)/(18 - 17) = 115/ 1 = 115 s
perimeter = total cost / cost per m = 10080 /20 = 504m
side of the square = 504/4 = 126m
breadth of the pavement = 3m
side of inner square = 126 - 6 = 120m
area of the pavement = (126 x126) - (120 x 120) = 246 x 6 sq m
cost of pavement = 246*6*50 = Rs. 73800
NOTE: When a century year leaves a remiander 0, when divided by 400 then it is a leap year (366 days).
So, 1200 has 366 days.