According to the formula .
Required time = (x + y) / (u + v)
Here, x = 70 m, y = 90 m, u = 10 m/s and v = 6 m/s
? Required time = (70 + 90) / (10 + 6) = 160/16 = 10 s
4th observation i.e., 8 is the median.
47/10000 = .0047
.02 =(2/100) x 100% =2%
Let N / 11 = 233
Then, N = 233 x 11 = 2563
? Missing digit is 5.
121012 = 12 x 10084 + 4
? remainder = 4
We have the important relation, More work, More time (days)
? A piece of work can be done in 6 days.
? Three times of work of same type can be done in 6 x 3
= 18 days
? = 750.0003 ÷ 19.999
? ? ? 750 ÷ 20
? ? ? 375 ? 38
Comments
There are no comments.Copyright ©CuriousTab. All rights reserved.