logo

CuriousTab

CuriousTab

Discussion


Home Digital Electronics Digital System Projects Using HDL Comments

  • Question
  • A very critical dimension in project management is ________.


  • Options
  • A. cost
  • B. skill
  • C. time
  • D. personnel

  • Correct Answer
  • time 


  • Digital System Projects Using HDL problems


    Search Results


    • 1. In the keypad encoder, the ________ activate(s) the freeze bit only when one column is low.

    • Options
    • A. NAND columns
    • B. CASE structure
    • C. freeze function
    • D. BCD counter
    • Discuss
    • 2. In the digital clock project, the 60 Hz signal is sent through a Schmitt-trigger circuit to produce square pulses at the rate of ________.

    • Options
    • A. 1 pps
    • B. 60 pps
    • C. 100 pps
    • D. 600 pps
    • Discuss
    • 3. Using one case construct inside another is known as ________.

    • Options
    • A. doping
    • B. functioning
    • C. freezing
    • D. nesting
    • Discuss
    • 4. The timing and control block provides the ________ for the frequency counter.

    • Options
    • A. brains
    • B. BCD counters
    • C. display register
    • D. six different frequency measurement ranges
    • Discuss
    • 5. In the keypad encoder, the ring counter is implemented using ________ that responds to the clk input.

    • Options
    • A. SIGNAL
    • B. FUNCTION
    • C. CASE
    • D. PROCESS
    • Discuss
    • 6. The interface of the stepper motor needs to operate in one of ________ mode(s).

    • Options
    • A. one
    • B. two
    • C. three
    • D. four
    • Discuss
    • 7. In the keypad encoder, just after the 4 ms mark, the simulation initiates the release of the key by changing the column value to ________, which causes the d output to go into its Hi-Z state.

    • Options
    • A. 0 hex
    • B. 4 hex
    • C. 8 hex
    • D. F hex
    • Discuss
    • 8. In the digital clock design, the hours section is different from the seconds and minutes section in that it never goes to ________.

    • Options
    • A. the 0 state
    • B. 13
    • C. the ring counter
    • D. the BCD counter
    • Discuss
    • 9. One aspect of project planning and management is the selection of ________ that will best fit the application.

    • Options
    • A. hardware platform
    • B. software
    • C. personnel
    • D. time
    • Discuss
    • 10. In the digital clock project, the 1 pps signal is used as a synchronous clock for all of the counter stages, which are ________.

    • Options
    • A. advanced BCD counters
    • B. MOD-6 counters
    • C. synchronous cascaded
    • D. 1 pulse per second
    • Discuss


    Comments

    There are no comments.

Enter a new Comment