logo

CuriousTab

CuriousTab

Discussion


Home Digital Electronics Digital System Projects Using HDL Comments

  • Question
  • In HDL when a circuit is simulated on a computer, the designer must create all the different scenarios that will be experienced by the actual circuit and must also know the proper response to those inputs.


  • Options
  • A. True
  • B. False

  • Correct Answer
  • True 


  • Digital System Projects Using HDL problems


    Search Results


    • 1. One CASE construct inside another CASE construct is called a do-loop.

    • Options
    • A. True
    • B. False
    • Discuss
    • 2. In the digital clock project, the 60 Hz signal is sent through a Schmitt-trigger circuit to produce sine wave pulses at the rate of 60 pps.

    • Options
    • A. True
    • B. False
    • Discuss
    • 3. In the digital clock project HDL, the 1 pps signal is used as a synchronous clock for all of the counters' stages, which are synchronously cascaded.

    • Options
    • A. True
    • B. False
    • Discuss
    • 4. A frequency counter is a circuit that can measure and display the frequency of a signal.

    • Options
    • A. True
    • B. False
    • Discuss
    • 5. In the frequency counter, the pulse width of the enable signal is very critical for taking an accurate frequency measurement.

    • Options
    • A. True
    • B. False
    • Discuss
    • 6. The wave-drive sequence of a stepper motor has more torque and operates more smoothly than the full-step sequence at moderate speeds.

    • Options
    • A. True
    • B. False
    • Discuss
    • 7. One of the first steps in any HDL project is to define its scope by naming each input and output.

    • Options
    • A. True
    • B. False
    • Discuss
    • 8. In HDL, one of the strategies used in strategic planning is to find a way to test each piece of the project.

    • Options
    • A. True
    • B. False
    • Discuss
    • 9. Top-down design means that we start at the highest level of the hierarchy, or that the entire project is considered to exist in a closed dark box with inputs and outputs.

    • Options
    • A. True
    • B. False
    • Discuss
    • 10. A very critical dimension in project management is the time your boss will give you to complete the HDL project.

    • Options
    • A. True
    • B. False
    • Discuss


    Comments

    There are no comments.

Enter a new Comment