A parabolic curve is used to connect a 4% upgrade with a 2% downgrade as shown in the below figure. The highest point on the summit is at a distance of (measured horizontally from the first tangent point - (FTP)
Options
A. 50 m
B. 60 m
C. 75 m
D. 100 m
Correct Answer
75 m
More questions
1. An ordinary Portland cement when tested for its fineness, should not leave any residue on I.S. seive No. 9, more than