Three reservoirs A, B and C are interconnected by pipes as shown in the below figure Water surface elevations in the reservoirs and the Piezometric Head at the junction J are indicated in the below figure. Discharges Q1, Q2 and Q3 are related as
Options
A. Q1 + Q2 = Q3
B. Q1 = Q2 + Q3
C. Q2 = Q1 + Q3
D. Q1 + Q2 + Q3 = 0
Correct Answer
Q1 = Q2 + Q3
More questions
1. The digested sludge from septic tanks, is removed after a maximum period of