CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Civil Engineering
‣
Water Supply Engineering
Comments
Question
Cast iron pipes
Options
A. are widely used in city water supplies
B. resist corrosion satisfactorily
C. may last for 100 years
D. are normally manufactured in lengths of about 3.5 m
E. all the above.
Correct Answer
all the above.
Water Supply Engineering problems
Search Results
1. Pick up the correct statement from the following :
Options
A. The pH value of neutral water is 7
B. The maximum acidity is obtained when pH value is zero
C. The maximum alkalinity is obtained when pH value is 14.
D. All the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: All the above.
2. Underground water is obtained from
Options
A. rains
B. rivers
C. lakes
D. reservoirs
E. springs.
Show Answer
Scratch Pad
Discuss
Correct Answer: springs.
3. The duration of contact of chlorine with water before it is served to the first consumer, should be at least
Options
A. 10 to 15 minutes
B. 15 to 20 minutes
C. 20 to 30 minutes
D. 30 to 40 minutes
E. one hour.
Show Answer
Scratch Pad
Discuss
Correct Answer: 20 to 30 minutes
4. De-chlorination is followed by
Options
A. post-chlorination
B. pre-chlorination
C. double-chlorination
D. super-chlorination.
Show Answer
Scratch Pad
Discuss
Correct Answer: super-chlorination.
5. Efficiency of removing bacterias from raw water by a slow sand filter, is
Options
A. 80% to 81%
B. 85% to 86%
C. 90% to 97%
D. 98% to 99%.
Show Answer
Scratch Pad
Discuss
Correct Answer: 98% to 99%.
6. The intake opening is generally covered by a screen to prevent entry of debris etc. and its level is kept
Options
A. at the level of water of the source
B. at the bottom of water of the source
C. at about 2.5 m above the bottom
D. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: at about 2.5 m above the bottom
7. Plain chlorination is used for water
Options
A. with turbidities less than 20 mg/litre
B. obtained from clear lakes
C. consumed during emergencies
D. supplies to armies during war
E. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
8. P.V.C. pipes can withstand pressure bead of water upto
Options
A. 25 m
B. 50 m
C. 75 m
D. 100 m
E. 125 m.
Show Answer
Scratch Pad
Discuss
Correct Answer: 100 m
9. Open channels supported over tres-les, are generally known as
Options
A. raised canals
B. acqueducts
C. syphons
D. flumes.
Show Answer
Scratch Pad
Discuss
Correct Answer: flumes.
10. The maximum non-verticality of the bore of a well 200 m deep, may be permitted up to
Options
A. 25 cm
B. 50 cm
C. 75 cm
D. 100 cm
E. 150 cm.
Show Answer
Scratch Pad
Discuss
Correct Answer: 100 cm
Comments
There are no comments.
Enter a new Comment
Save
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering