Estimates of a water supply project depends upon the rate of water supply per capita consumption and probable population estimated at the end of the design period of
Options
A. 5 to 10 years
B. 10 to 15 years
C. 15 to 20 years
D. 20 to 30 years
E. 25 years.
Correct Answer
20 to 30 years
More questions
1. The digested sludge from septic tanks, is removed after a maximum period of