CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Civil Engineering
‣
Water Supply Engineering
Comments
Question
The temporary hardness of water can be removed by
Options
A. boiling
B. adding lime
C. adding alum
D. filtration
E. sedimentation.
Correct Answer
boiling
Water Supply Engineering problems
Search Results
1. Slow sand filter is used if maximum turbidity of raw water is less than
Options
A. 10 gm/litre
B. 20 gm/litre
C. 30 gm/litre
D. 40 gm/litre
E. 50 gm/litre.
Show Answer
Scratch Pad
Discuss
Correct Answer: 50 gm/litre.
2. Standard unit of turbidity of water is in one litre of distilled water, one milligram of finely divided
Options
A. silica
B. mud
C. clay
D. organic matter.
Show Answer
Scratch Pad
Discuss
Correct Answer: silica
3. Normal values of overflow rate for plain sedimentation tanks in litres/hr/m
2
, generally range between
Options
A. 100 to 250
B. 250 to 500
C. 500 to 750
D. 750 to 1000
Show Answer
Scratch Pad
Discuss
Correct Answer: 500 to 750
4. The coefficient of permeability of soils, is generally expressed in
Options
A. cm/sec
B. cm/minute
C. cm
2
/sec
D. cm
2
/minute.
Show Answer
Scratch Pad
Discuss
Correct Answer: cm/sec
5. 'Shrouding' is essentially provided in
Options
A. strainer type wells
B. cavity type wells
C. slotted type well
D. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: slotted type well
6. Water losses in water supply, is assumed as
Options
A. 5%
B. 7.5%
C. 10%
D. 22.5%
E. 15%.
Show Answer
Scratch Pad
Discuss
Correct Answer: 15%.
7. A centrifugal pump is required to be primed before starting if it is located
Options
A. at higher level than water level of reservoir
B. at lower level than water level of reservoir
C. both (a) and (b)
D. neither (a) nor (b).
Show Answer
Scratch Pad
Discuss
Correct Answer: at higher level than water level of reservoir
8. Rapid gravity filters
Options
A. were developed by G.W. Fullar
B. make use of coarser sand with effective size as 0.5 mm
C. yield as high as 30 times the yield of slow sand filters
D. are fed with coagulation treated water
E. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
9. Property of earth to allow water to pass through it, is known as
Options
A. perviousness
B. porosity
C. permeability
D. transmissibility.
Show Answer
Scratch Pad
Discuss
Correct Answer: perviousness
10. The chloride content of treated water for public supplies should not exceed
Options
A. 100 ppm
B. 150 ppm
C. 200 ppm
D. 250 ppm
E. 300 ppm.
Show Answer
Scratch Pad
Discuss
Correct Answer: 250 ppm
Comments
There are no comments.
Enter a new Comment
Save
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering