Curioustab
Aptitude
General Knowledge
Verbal Reasoning
Computer Science
Interview
Aptitude
General Knowledge
Verbal Reasoning
Computer Science
Interview
Home
»
Civil Engineering
»
Surveying
For the construction of highway (or railway)
longitudinal sections are required
cross sections are required
both longitudinal and cross sections are required
none of these.
Correct Answer:
both longitudinal and cross sections are required
← Previous Question
Next Question→
More Questions from
Surveying
A bearing of a line is also known as
An ideal vertical curve to join two gradients, is
The accuracy of measurement in chain surveying, does not depend upon
If a 30 m chain diverges through a perpendicular distance d from its correct alignment, the error in length, is
An imaginary line joining the points of equal elevation on the surface of the earth, represents
If arithmetic sum of latitudes of a closed traverse is ∑Lat and closing error in latitude is dx, the correction for a side whose latitude is l, as given by Transit Rule, is
Pick up the correct statement from the following :
In chain surveying tie lines are primarily provided
The probable error of the adjusted bearing at the middle is
The real image of an object formed by the objective, must lie
Discussion & Comments
No comments yet. Be the first to comment!
Name:
Comment:
Post Comment
Join Discussion
Discussion & Comments