Curioustab
Aptitude
General Knowledge
Verbal Reasoning
Computer Science
Interview
Aptitude
General Knowledge
Verbal Reasoning
Computer Science
Interview
Home
»
Civil Engineering
»
Surveying
The main principle of surveying is to work
from part to the whole
from whole to the part
from higher level to the lower level
from lower level to higher level.
Correct Answer:
from whole to the part
← Previous Question
Next Question→
More Questions from
Surveying
Keeping the instrument height as 1.5 m, length of staff 4 m, the slope of the ground as 1 in 10, the sight on the down-slope, must be less than
Pick up the correct statement from the following :
If S is the length of a subchord and R is the radius of simple curve, the angle of deflection between its tangent and sub-chord, in minutes, is equal to
The slope correction for a length of 30 m along a gradient of 1 in 20, is
Two concave lenses of 60 cm focal length are cemented on either side of a convex lens of 15 cm focal length. The focal length of the combination is
Pick up the method of surveying in which field observations and plotting proceed simultaneously from the following
The most reliable method of plotting a theodolite traverse, is
If h is the difference in level between end points separated by l, then the slope correction is . The second term may be neglected if the value of h in a 20 m distance is less than
The radius of curvature of the arc of the bubble tube is generally kept
If θ is the slope of the ground and l is the measured distance, the correction is
Discussion & Comments
No comments yet. Be the first to comment!
Name:
Comment:
Post Comment
Join Discussion
Discussion & Comments