and 11¼ minutes as 675 seconds.
Rate upstream = | ❨ | 750 | ❩m/sec | = | 10 | m/sec. |
675 | 9 |
Rate downstream = | ❨ | 750 | ❩m/sec | = | 5 | m/sec. |
450 | 3 |
∴ Rate in still water = | 1 | ❨ | 10 | + | 5 | ❩m/sec |
2 | 9 | 3 |
= | 25 | m/sec |
18 |
= | ❨ | 25 | x | 18 | ❩km/hr |
18 | 5 |
= 5 km/hr.
We have the important relation, More work, More time (days)
? A piece of work can be done in 6 days.
? Three times of work of same type can be done in 6 x 3
= 18 days
? = 750.0003 ÷ 19.999
? ? ? 750 ÷ 20
? ? ? 375 ? 38
Subtract 20, 25, 30, 35, 40, 45 from successive numbers. So 0 is wrong.
NA
Each previous number is multiplied by 2.
? 8 m shadow means original height = 12 m
? 1 m shadow means original height = 12/8 m
? 100 m shadow means original height = (12/8) x 100 m
= (6/4) x 100 = 6 x 25 = 150 m
Let 8% of 96 = y of 1/25
? (8 x 96)/100 = y/25
? y = (8 x 96 x 25)/100 = 192
Since the principal is not given, so data is inadequate.
Comments
There are no comments.Copyright ©CuriousTab. All rights reserved.