  • 50 men can build a tank in 40days, but though they begin the work together, 5 men quit every ten days. The time needed to build the tank is ?


  • Options
  • A. 50 days
  • B. 48 days
  • C. 47.5 days
  • D. 49 days

  • Correct Answer
  • 50 days 

    Explanation

    50 men can build a tank in 40 days 

    Assume 1 man does 1 unit of work in 1 day

    Then the total work is 50×40 = 2000 units

     

    50 men work in the first 10 days and completes 50×10 = 500 units of work

    45 men work in the next 10 days and completes 45×10 = 450 units of work

    40 men work in the next 10 days and completes 40×10 = 400 units of work

    35 men work in the next 10 days and completes 35×10 = 350 units of work

    So far 500 + 450 + 400 + 350 = 1700 units of work is completed and

     

    Remaining work is 2000 - 1700 = 300 units

     

    30 men work in the next 10 days. In each day, they does 30 units of work.

     

    Therefore, additional days required = 300/30 =10

     

    Thus, total 10+10+10+10+10 = 50 days required.

  • Tags: GATE, CAT, Bank Exams, Bank PO, Bank Clerk

    Time and Work problems


    Search Results


    • 1. In a hostel, there was food for 1000 students for one month. After 10 days, 1000 more students joined the hostel. How long would the students be able to carry on with the remaining food?

    • Options
    • A. 10 days
    • B. 15 days
    • C. 20 days
    • D. 5 days
    • Discuss
    • 2. 28 Men and 52 women working together completes a work in 22.5 days. 35 men and 65 women working together on same work will complete it in how many days?

    • Options
    • A. 16
    • B. 18
    • C. 19
    • D. 21
    • Discuss
    • 3. A tank has an inlet and outlet pipe. The inlet pipe fills the tank completely in 2 hours when the outlet pipe is plugged. The outlet pipe empties the tank completely in 6 hours when the inlet pipe is pluggeed. If there is a lekage also which is capable of draining out the liquid from the tank at half of the rate of outet pipe,them what is the time taken to fill the emty tank when both the pipes are opened?

    • Options
    • A. 3 hours
    • B. 4 hours
    • C. 5 hours
    • D. None of these
    • Discuss
    • 4. 16 men and 12 women can complete a work in 20 days. 18 women can complete the same work in 40 days. In how many days will 12 men 27 women complete the same work?

    • Options
    • A. 16 days
    • B. 18 days
    • C. 19 days
    • D. 21 days
    • Discuss
    • 5. Twenty men can do a work in eighteen days. Eighteen women can complete the same work in fifteen days. What is the ratio between the capacity of a woman and a man ?

    • Options
    • A. 4:5
    • B. 3:4
    • C. 4:3
    • D. 2:3
    • Discuss
    • 6. Adam and Smith are working on a project. Adam takes 6 hrs to type 36 pages on a computer, while Smith takes 5 hrs to type 40 pages. How much time will they take, working together on two different computers to type a project of 120 pages?

    • Options
    • A. 8 hrs 45 min
    • B. 8 hrs 42 min
    • C. 8 hrs
    • D. 8 hrs 34 min
    • Discuss
    • 7. 6 boys and 8 girls can do job in 10 days , 26 boys & 48 women do work in 2 days. Find time taken by 15 boys and 20 girls to do same work ?

    • Options
    • A. 2 days
    • B. 3 days
    • C. 4 days
    • D. 5 days
    • Discuss
    • 8. After working for 8 days, Hari Ram finds that only 1/3 rd of the work has been done. He employs Satya who is 60% as efficient as Hari Ram. How many days more would Satya take to complete the work ?

    • Options
    • A. 24 1/2 days
    • B. 25 3/2 days
    • C. 24 2/3 days
    • D. 26 2/3 days
    • Discuss
    • 9. Pavan and Sravan are two persons. If Pavan works with his actual efficiency and Sravan twice of his actual efficiency then it takes 25 days to complete the work. But If Pavan works twice of his actual efficiency and Sravan with his normal efficiency then the work is completed in 20 days. How many days would it take if Sravan alone works with his actual efficiency (in Days)?

    • Options
    • A. 50
    • B. 100
    • C. 70
    • D. 35
    • Discuss
    • 10. Priya can do a work in 16 days. In how many days will the work be completed by Sai, if the efficiency of Sai is 60% more than that of Priya ?

    • Options
    • A. 8 days
    • B. 12 days
    • C. 14 days
    • D. 10 days