Part filled in 4 minutes =4(1/15+1/20) = 7/15
Remaining part =(1-7/15) = 8/15
Part filled by B in 1 minute =1/20 : 8/15 :: 1:x
x = (8/15*1*20) =
The tank will be full in (4 min. + 10 min. + 40 sec.) = 14 min. 40 sec
We have the important relation, More work, More time (days)
? A piece of work can be done in 6 days.
? Three times of work of same type can be done in 6 x 3
= 18 days
? = 750.0003 ÷ 19.999
? ? ? 750 ÷ 20
? ? ? 375 ? 38
Subtract 20, 25, 30, 35, 40, 45 from successive numbers. So 0 is wrong.
NA
Each previous number is multiplied by 2.
? 8 m shadow means original height = 12 m
? 1 m shadow means original height = 12/8 m
? 100 m shadow means original height = (12/8) x 100 m
= (6/4) x 100 = 6 x 25 = 150 m
Let 8% of 96 = y of 1/25
? (8 x 96)/100 = y/25
? y = (8 x 96 x 25)/100 = 192
Since the principal is not given, so data is inadequate.