From the given data,
containers contain mixtures of milk and water as 1365 lit, 1560 lit and 1755 lit.
Biggest measure that can measure all these different quantities exactly can be given by
HCF of (1365, 1560, 1755)
That can be found as
HCF of 1365, 1755 = 195
Now, HCF of 195 and 1560 = 195
Hence, biggest measure that can measure all the given different quantities exactly is 195 lit.
(A + B)'s 2 day's work = 2 x (1/3) = 2/3
Remaining work = 1 - (2/3) = 1/3
A will complete 1/3 work in 2
A will complete 1 work in 6
A's 1 days work = 1/6
B's 1 day's work = (1/3) - (1/6) = 1/6
? B will take 6 days to complete the work alone.
Distance covered in one revolution = total distance travelled / total number of revolution.
= ( 88 x 1000) / 1000 m
= 88 m
We know that the distance covered in one revolution = circumference of the wheel.
? ?d = 88
? 22d / 7 = 88
? d = 28 m
So, 36 is wrong.
Given expression = (.896 x .752 +.896 x .248) / (.7 x .034 + .7 x.966)
=.[896 x (.752+.248)] / [.7 x (.034+.966)]
= .(896 x 1) / ( .700 x 1)
=896/700
= 1.28
Average speed =2 x 40 x 60 / ( 40+ 60)
= 4800 / 100
= 48 km/hr
Each day of the week is repeated after 7 days.
So, after 63 days, it will be Monday.
After 61 days, it will be Saturday.
9548 16862 = 8362 + x + 7314 x = 16862 - 8362 ----- = 8500 16862 -----
We know that
BG = SI on TD = (240 x 30 x 1 x 1)/100
= ? 72
BG = BD - TD
? BD = BG + TD
= 72 + 240
= ? 312
If previous year is leap year then calendar of May is similar to July
In tossing a coin 2 times the sample space is 4 i,e (H, H), (H, T), (T, H), (T, T)
(1) If A1 denotes exactly one head
then A1 = {(H, T) (T, H) }
So, P(A1 ) = 2/4 = 1/2
(2) If A denotes at least one head
then A = {(H, T) (T, H) (H, H)}
? A = {(H, T) (T, H) (H, H )}
? P(A) = 3/4
Comments
There are no comments.Copyright ©CuriousTab. All rights reserved.