First, we can select 12 beads out of 18 beads in 18C12 ways.
Now, these 12 beads can make a necklace in 11! / 2 ways as clockwise and anti-clockwise arrangements are same.
So, required number of ways = [ 18C12 .11! ] / 2!
= [18C6.11! ] / 2!
= [18 x 17 x 16 x 15 x 14 x 13 x 11! ] / [6 x 5 x 4 x 3 x 2 x 1 x 2!]
= [17 x 7 x 13! ] / 2!
= 119 x 13 !/ 2
We have the important relation, More work, More time (days)
? A piece of work can be done in 6 days.
? Three times of work of same type can be done in 6 x 3
= 18 days
? = 750.0003 ÷ 19.999
? ? ? 750 ÷ 20
? ? ? 375 ? 38
Subtract 20, 25, 30, 35, 40, 45 from successive numbers. So 0 is wrong.
NA
Each previous number is multiplied by 2.
? 8 m shadow means original height = 12 m
? 1 m shadow means original height = 12/8 m
? 100 m shadow means original height = (12/8) x 100 m
= (6/4) x 100 = 6 x 25 = 150 m
Let 8% of 96 = y of 1/25
? (8 x 96)/100 = y/25
? y = (8 x 96 x 25)/100 = 192
Since the principal is not given, so data is inadequate.
Comments
There are no comments.Copyright ©CuriousTab. All rights reserved.