Put n = 1, now the sum of the series = 1.2.4 = 8
Put n = 1, in the options
(a) 1(1 + 1) (1 + 2) = 6
(b) 1(1 + 1)/12 x (3 + 19 + 26) = 8
(c) (1 + 1) (1 + 2) (1 + 3)/4 = 6
(d) 1(1 + 1) (1 + 2) (1 + 3 )/3 = 8
As, the sum of series = 8
Hence, option (a) and (c) can be rejected.
Now, put n = 2
Sum 1. 2. 4 + 2 . 3 . 5 = 38
Put n = 2, in option (b)
2(2 + 1)/12 (3 x 4 + 19 x 2 + 26)38
Hence, (b) is the correct option.
We have the important relation, More work, More time (days)
? A piece of work can be done in 6 days.
? Three times of work of same type can be done in 6 x 3
= 18 days
? = 750.0003 ÷ 19.999
? ? ? 750 ÷ 20
? ? ? 375 ? 38
Subtract 20, 25, 30, 35, 40, 45 from successive numbers. So 0 is wrong.
NA
Each previous number is multiplied by 2.
? 8 m shadow means original height = 12 m
? 1 m shadow means original height = 12/8 m
? 100 m shadow means original height = (12/8) x 100 m
= (6/4) x 100 = 6 x 25 = 150 m
Let 8% of 96 = y of 1/25
? (8 x 96)/100 = y/25
? y = (8 x 96 x 25)/100 = 192
Since the principal is not given, so data is inadequate.
Comments
There are no comments.Copyright ©CuriousTab. All rights reserved.