The construction manager uses the estimate of the project

Civil Engineering Engineering Economy
Choose an option
  • A
    to tell the owner of the project to take his/her financial decision.
  • B
    to advise the architect/engineer regarding design cost parameter especially in value engineering analysis.
  • C
    to develop bids on the project.
  • D
    to control the project during its construction.
  • E
    All of these

Answer

Correct Answer: All of these