It is customary to design a sewer for D.W.F. on the basis of
average demand
twice the average demand
thrice the average demand
four times the average demand.
Correct Answer:
thrice the average demand
← Previous Question
Next Question→
More Questions from
Waste Water Engineering
The detention period for plain sedimentation water tanks, is usually
Sewer ventilating columns are generally placed at
In case of Imhoff tanks,
Pick up the correct statement from the following :
In sewers the highest non-scouring velocity is achieved in
The standard B.O.D. of water is taken for
The ratio of the diameter of a circular section and the side of a square section hydraulically equivalent, is
The digested sludge from septic tanks, is removed after a maximum period of
The settling velocity of the particles larger than 0.06 mm in a settling tank of depth 2.4 is 0.33 m per sec. The detention period recommended for the tank, is
In a city the ratio of the drainage to sewage is 20, the percentage discharge passing through non-monsoon periods, is
Discussion & Comments
No comments yet. Be the first to comment!
Name:
Comment:
Post Comment
Join Discussion
Discussion & Comments