A circular sewer section is preferred to because
it is cheaper in construction
it provides maximum area for a given perimeter
it provides maximum hydraulic mean depth
all the above.
Correct Answer:
all the above.
← Previous Question
Next Question→
More Questions from
Waste Water Engineering
The sewer which transports the sewage to the point of treatment, is called
The porosity of sediments in sewer pipes, is usually taken as
You are asked to design sewer pipes of diameters 0.4 m to 0.9 m at maximum flow, you will assume the sewer flow running at
Pick up the correct statement from the following :
Imhoff cone is used to determine
In septic tanks, decomposition of organic bacteria, is done by
Pick up the incorrect statement from the following :
A nuisance is experienced in diluting water if dilution factor is less than
Drop manholes at the junctions of sewer lines, are provided if
In sewage, the solids in mg per litre is