Deviation of the actual road gradient from the proposed contou'r gradient up hill side, involves
embankment on the centre line
excavation on the centre line
earth work on the centre line
none of these.
Correct Answer:
excavation on the centre line
← Previous Question
Next Question→
More Questions from
Surveying
Pick up the correct statement from the following :
The best method of interpolation of contours, is by
A tape of length l and weight W kg/m is suspended at its ends with a pull of P kg, the sag correction is
If the sight distance (S) is equal to the length of the vertical-curve (2l) joining two grades g1% and - g2%, the height of the apex will be
The branch of surveying in which both horizontal and vertical positions of a point, are determined by making instrumental observations, is known
The latitude of a traverse leg is obtained by multiplying its length by
Probable systematic error in precise levelling as recommended by International Geodetic Association should not exceed (where k is in kilometers.)
If the rate of gain of radial acceleration is 0.3 m per sec3 and full centrifugal ratio is developed. On the curve the ratio of the length of the transition curve of same radius on road and railway, is
True meridian of different places
For setting out a simple curve, using two theodolites.
Discussion & Comments
No comments yet. Be the first to comment!
Name:
Comment:
Post Comment
Join Discussion
Discussion & Comments