Curioustab
Aptitude
General Knowledge
Verbal Reasoning
Computer Science
Interview
Aptitude
General Knowledge
Verbal Reasoning
Computer Science
Interview
Home
»
Civil Engineering
»
Railways
Track construction involves preparation of
subgrade
plate laying
ballasting
all the above.
Correct Answer:
all the above.
← Previous Question
Next Question→
More Questions from
Railways
Staggered rail joints are generally provided
Rail section is generally designated by its
Smitch diamond is provided if the angle of diamond is less than
The check rails are placed opposite the crossing so that
Widening of gauge is provided if degree of the curve, is
Steel sleepers are
Pick up the incorrect statement from the following. Required tilt of 1 in 20 is provided
To avoid the damage of nose of crossing, the wing rails are ramped so that nose of crossing remains at a lower level by
Sand may be used as ballast for
If G is gauge distance and a is crossing, the distance between the nose of acute crossing and nose of obtuse crossing of a rail diamond, measured along the rail not forming the diamond, is
Discussion & Comments
No comments yet. Be the first to comment!
Name:
Comment:
Post Comment
Join Discussion
Discussion & Comments