Along high ways confirmatory route markers are generally fixed
before the crossing on the left side
after the crossing on the left side
before the crossing on the right side
after the crossing on the right side.
Correct Answer:
after the crossing on the left side
← Previous Question
Next Question→
More Questions from
Highway Engineering
For Indian conditions, the water bound macadam roads, are suitable if daily traffic does not exceed
The desirable camber for straight cement concrete roads, is
If d is the thickness of a concrete pavement, the equivalent radius b of resisting section for an interior loading, is
If N is the algebraic difference of grades, S is the head light beam distance in metres, the length (L) of a valley curve, is
Selection of the routes, of highways depends upon
The minimum design speed of various types of highways in plain terrain is the same as the ruling design speed of
The width of different roads as recommended in Nagpur plan by the Indian Road Conference for hilly region, is
The absolute minimum sight distance required for stopping a vehicle moving with a speed of 80 km ph, is
Pick up the correct statement from the following:
Driving vehicles on wet surfaced roads, is dangerous because it may
Discussion & Comments
No comments yet. Be the first to comment!
Name:
Comment:
Post Comment
Join Discussion
Discussion & Comments