logo

CuriousTab

CuriousTab

System Analysis and Design problems


  • 1. The step-by-step instructions that solve a problem are called _____.

  • Options
  • A. An algorithm
  • B. A list
  • C. A plan
  • D. A sequential structure
  • E. None of the above
  • Discuss
  • 2. The starting point for development of an MIS is;

  • Options
  • A. identification of business processes that are the essence of the business
  • B. a distributed database management
  • C. the system has a large number of PCs and a LAN.
  • D. purchase of a mini computers
  • E. None of the above
  • Discuss
  • 3. Data Definition Language (DDL)

  • Options
  • A. describes how data are structured in the data base
  • B. specifies for the DBMS what is required; the techniques used to process data
  • C. determine how data must be structured to produce the user's view
  • D. All of the above
  • Discuss
  • 4. The two classifications of inputs are

  • Options
  • A. energies and maintenance
  • B. maintenance and waste
  • C. maintenance and signal
  • D. products and waste
  • E. None of the above
  • Discuss
  • 5. During the maintenance phase

  • Options
  • A. System requirements are established
  • B. System analysis is carried out
  • C. Programs are tested
  • D. All of the above
  • E. None of the above
  • Discuss
  • 6. On a systems flowchart, the online manual keeping of input data is identified by using the

  • Options
  • A. online storage symbol
  • B. Online keyboard symbol
  • C. keeping operation symbols
  • D. manual operation symbols
  • E. None of the above
  • Discuss
  • 7. A Ring, refers to a record chain, the last of which refers to the first record, in the chain, is called a/an

  • Options
  • A. addressing
  • B. location
  • C. pointer
  • D. loop
  • E. None of the above
  • Discuss
  • 8. Indexed-Sequential organization

  • Options
  • A. means storing records in contiguous blocks according to a key.
  • B. Stores records sequentially but uses an index to locate records
  • C. uses an index for each key type
  • D. has records placed randomly throughout the file
  • E. None of the above
  • Discuss
  • 9. System Study involves

  • Options
  • A. study of an existing system
  • B. documenting the existing system.
  • C. identifying current deficiencies and establishing new goals
  • D. All of the above
  • E. None of the above
  • Discuss
  • 10. Positive testing is

  • Options
  • A. running the system with line data by the actual user
  • B. making sure that the new programs do in fact process certain transactions according to Specifications
  • C. is checking the logic of one or more programs in the candidate system
  • D. testing changes made in an existing or a new program
  • E. None of the above
  • Discuss

First 4 5 6 ... 15 .. 25 26 Last