CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Railways problems
1. Distance between inner faces of the flanges, is kept
Options
A. equal to the gauge distance
B. slightly less than the gauge distance
C. slightly more than the gauge distance
D. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: slightly less than the gauge distance
2. Distance between the inner rail and check rail provided on sharp curve, is
Options
A. 40 mm
B. 42 mm
C. 44 mm
D. 46 mm
E. 50 mm
Show Answer
Scratch Pad
Discuss
Correct Answer: 44 mm
3. Boxing of ballast is done
Options
A. under rails
B. at the rails
C. in between two rails
D. in between two sleepers.
Show Answer
Scratch Pad
Discuss
Correct Answer: at the rails
4. If ? is switch angle and
R
is radius of the turnout, the length of the tongue rail, is
Options
A.
R
sin ?
B.
R
tan ?
C. R sin ?/2
D. R tan ?/2
E. R cos ?/2
Show Answer
Scratch Pad
Discuss
Correct Answer: R tan ?/2
5. A welded rail joint is generally
Options
A. supported on a sleeper
B. supported on a metal plate
C. suspended
D. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: suspended
6. For holding a rail in position, no chairs are used for
Options
A. flat footed rails
B. bull headed rails
C. double headed rails
D. both (
a
) and (
b
)
Show Answer
Scratch Pad
Discuss
Correct Answer: flat footed rails
7. Pot sleepers are in the form of
Options
A. a number of bowls connected together with a tie bar
B. two bowls placed under each rail and connected together with a tie bar
C. two bowls placed under two rails and the one between the rails
D. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: two bowls placed under each rail and connected together with a tie bar
8. Pick up the correct statement from the following :
Options
A. Rails are directly laid over hard wooden sleepers and fixed with spikes
B. Adzing is done on hard wooden sleepers
C. Bearing plates are used on soft wooden sleepers
D. Chairs are used for bull headed rails
E. All the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: All the above.
9. If absolute levels of rails at the consecutive axles
A
,
B
, and
C
separated by 1.8 metres are 100.505 m, 100.530 m, and 100.525 m respectively, the unevenness of rails, is
Options
A. 0.065 m
B. 0.055 m
C. 0.045 m
D. 0.035 m
Show Answer
Scratch Pad
Discuss
Correct Answer: 0.065 m
10. Best wood for wooden sleepers is
Options
A. chir
B. deodar
C. sal
D. teak
E. shesham.
Show Answer
Scratch Pad
Discuss
Correct Answer: teak
First
3
4
5
...
10
..
16
17
Last
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering