CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Docks and Harbours problems
1. A low wall built out into the sea more or less perpendicular to the coast line, to resist the travel of sand and shingle along a beach, is called
Options
A. break water
B. break wall
C. groins
D. shore wall.
Show Answer
Scratch Pad
Discuss
Correct Answer: groins
2. Pick up the correct statement from the following:
Options
A. a harbour without any port complex, is called a
refuge harbour
B. a harbour used for fishery, is called
fishery harbour
C. the terminal building of a commercial harbour consists of an administrative block, customs clearance and ware-houses.
D. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
3. The low water datum for a lake is defined as the surface of the lake when it is at elevation
Options
A. 180.5 m above M.S.L.
B. 190.5 m above M.S.L.
C. 170.5 m above M.S.L.
D. 200.0 m above M.S.L.
Show Answer
Scratch Pad
Discuss
Correct Answer: 180.5 m above M.S.L.
4. Pick up the correct statement from the following:
Options
A. The tides at any place occur a little less than 1 hour later, each succeeding day
B. The difference in time in solar hours and minutes from any lunar transit to the succeeding transit, is called high water level
C. The influence of the earth's gravity alone produces level-tidal less sea
D. The spinning force is maximum at the equator and zero at the poles
E. All of the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: All of the above.
5. In a wet dock system,
Options
A. minimum required depth of water for the vessels is maintained
B. entrance locks are provided with massive gates
C. the locks of dock gate are operated by means of heavy bascule bridges and connected machinery
D. the cost of construction is quite heavy
E. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
6. Pick up the incorrect statement from the following: In a dry dock block made of hard wood,
Options
A. spacing of the blocks is 1.35 m
B. the lowest block is 1.8 m long 40 cm x 40 cm in cross-section
C. the middle block is 1.6 m long 40 cm x 40 cm in crosss-section
D. the top block is 1.2 m long 40 cm x 40 cm in cross-section
E. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: none of these.
7. Buoys which support the cables to which vessels are attached are of
Options
A. cylindrical shape
B. drum
C. pear shaped
D. spherical shape
E. all of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: all of these.
8. Pick up the correct statement from the following:
Options
A. the Mediterranean sea is considered to be a huge harbour
B. the Caspean sea is considered to be a big harbour
C. the Red sea is considered to be harbour
D. none of the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: the Mediterranean sea is considered to be a huge harbour
9. Which one of the following statements is not relevant to hydrographic survey :
Options
A. establishment of a chain of bench marks near the shore line
B. establishment of horizontal control points on the shore
C. determination of the sea bed profile
D. depicting the irregularities in the shore line, islands and projecting rocks
E. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: none of these.
10. Which one of the following lines is used for tying a ship with a dock
Options
A. bow line
B. stern line
C. spring line
D. break line
E. all of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: all of these.
First
2
3
4
5
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering