CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Building Construction problems
1. Which of the following metal sheets is most effective in preventing dampness?
Options
A. Copper sheets
B. lead sheets
C. aluminium sheets
D. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
2. The form work from the slabs excluding props, can be removed only after
Options
A. 1 day
B. 4 days
C. 7 days
D. 14 days
Show Answer
Scratch Pad
Discuss
Correct Answer: 4 days
3. In soft clay of low bearing capacity, the type of steel pile generally used, is
Options
A. H-pile
B. screw pile
C. disc pile
D. pipe pile
E. raking pile.
Show Answer
Scratch Pad
Discuss
Correct Answer: screw pile
4. The sound which continues even after its source is cut off, is called
Options
A. reverberation
B. echo
C. intensity of sound
D. interference.
Show Answer
Scratch Pad
Discuss
Correct Answer: reverberation
5. The pile provided with one or more bulles in its vertical shaft, is generally known as
Options
A. under-ream pile
B. friction pile
C. bearing pile
D. sheet pile.
Show Answer
Scratch Pad
Discuss
Correct Answer: under-ream pile
6. The steel pile which is generally sunk in soft clay or loose sand of low bearing capacity, is
Options
A. H-pile
B. pipe pile
C. screw pile
D. disc pile
E. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: screw pile
7. The form work from the sides of beams can be removed only after
Options
A. 1 day
B. 4 days
C. 7 days
D. 14 days.
Show Answer
Scratch Pad
Discuss
Correct Answer: 1 day
8. The concrete slump recommended for foundations, is
Options
A. 25 to 50 mm
B. 30 to 125 mm
C. 50 to 100 mm
D. 75 to 125 mm
E. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: 50 to 100 mm
9. The stepped structure provided for lateral support of a structure, is
Options
A. retaining wall
B. breast wall
C. buttress
D. parapet wall.
Show Answer
Scratch Pad
Discuss
Correct Answer: buttress
10. Open test pit is only suitable upto a depth of
Options
A. 2 metres
B. 2.5 metres
C. 3 metres
D. none of the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: 3 metres
First
18
19
20
...
21
..
22
23
Last
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering