  • 1. A floor constructed with the 4 to 6 mm marble chips, is known

  • Options
  • A. reinforced marble floor
  • B. terrazo floor
  • C. marble floor
  • D. chip floor
  • E. mosaic floor.
  • Discuss
  • 2. Pick up the correct statement from the following :

  • Options
  • A. the roof slabs of multi-storeyed buildings are constructed monolithically to carry the various floor loads
  • B. the beams of multi-storeyed buildings rest on girders and are the main load transferring members to the columns
  • C. the slab is spanned across the secondary beams provided between the main beams
  • D. All of these.
  • Discuss
  • 3. Pick up the correct statement from the following :

  • Options
  • A. D.P.C. should be continuous
  • B. D.P.C. should be of good impervious material
  • C. D.P.C. may be horizontal or vertical
  • D. All the above.
  • Discuss
  • 4. The local swelling of a finished plaster, is termed

  • Options
  • A. cracking
  • B. dubbing
  • C. blistering
  • D. hacking.
  • Discuss
  • 5. The voussoir placed at crown of an arch, is known as a

  • Options
  • A. key
  • B. soffit
  • C. springer
  • D. haunch.
  • Discuss
  • 6. The pile which supports the load due to friction between pile face and surrounding soil, is generally known as

  • Options
  • A. bearing pile
  • B. friction pile
  • C. sheet pile
  • D. battered pile.
  • Discuss
  • 7. The minimum thickness of walls built in cement mortar (1 : 6) for a single storey building, is

  • Options
  • A. 10 cm
  • B. 15 cm
  • C. 20 cm
  • D. 25 cm
  • E. 30 cm.
  • Discuss
  • 8. Which one of the following activities is not correct as applicable to brick corbels

  • Options
  • A. the maximum projection of the corbel should not be more than the thickness of the wall
  • B. the maximum projection of each corbel course should be limited to a quarter brick at a time
  • C. the discontinuous corbels are used to carry heavy concentrated loads
  • D. stretcher bond is generally used for the construction of brick corbel.
  • Discuss
  • 9. For each storey of a building, the depth of exploration should be

  • Options
  • A. 1 metre
  • B. 2 metres
  • C. 3 metres
  • D. 4 metres.
  • Discuss
  • 10. Pick up the correct statements from the following :

  • Options
  • A. cracks appear on the plastered surface in the form of hair cracks
  • B. in brick work, the efflorescence is removed by applying a solution of zinc sulphate and water