Area to be plastered= [2(l + b) x h] + (l x b)
= [2(25 + 12) x 6] + (25 x 12)
= (444 + 300)
= 744
Cost of plastering = Rs. 744 x (75/100)= Rs. 558
Let the edge = a cm
So increase by 50 % = a + a/2 = 3a/2
Total surface Area of original cube =
TSA of new cube = = =
Increase in area = =
Increase % = = 125%
number of cubes=(18 x 18 x 18) / (3 x 3 x 3) = 216
Volume of the block = (6 x 12 x 15) cu.cm = 1080 cu.cm
Side of the largest cube = H.C.F. of 6 cm, 12 cm, 15 cm
= 3 cm.
Volume of this cube = (3 x 3 x 3) cu.cm = 27 cu.cm
Number of cubes = = 40.
Area of the wet surface = [2(lb + bh + lh) - lb]
= 2(bh + lh) + lb
= [2 (4 x 1.25 + 6 x 1.25) + 6 x 4]
= 49
No. of bricks= volume of the wall/volume of 1 brick
= (800 x 600 x 22.5) / (25 x 11.25 x 6) = 6400
Copyright ©CuriousTab. All rights reserved.