Let time taken to cover the distance = t
? Speed = (2t + 1)
? t(2t + 1) = 1830 ? 2t2 + t = 1830
? 2t2 + t - 1830 = 0
? t = -1 ± ?(1)2 - 4 x 2 x(-1830) / 2 x 2
= -1 ± ?1 + 14640 / 4
= -1 ± 121 / 4
Taking '+' sign t = -1 + 121 / 4 = 120/4 = 30
? Required ratio = (2 x 30 + 1) : 30 = 61 : 30
We have the important relation, More work, More time (days)
? A piece of work can be done in 6 days.
? Three times of work of same type can be done in 6 x 3
= 18 days
? = 750.0003 ÷ 19.999
? ? ? 750 ÷ 20
? ? ? 375 ? 38
Subtract 20, 25, 30, 35, 40, 45 from successive numbers. So 0 is wrong.
NA
Each previous number is multiplied by 2.
? 8 m shadow means original height = 12 m
? 1 m shadow means original height = 12/8 m
? 100 m shadow means original height = (12/8) x 100 m
= (6/4) x 100 = 6 x 25 = 150 m
Let 8% of 96 = y of 1/25
? (8 x 96)/100 = y/25
? y = (8 x 96 x 25)/100 = 192
Since the principal is not given, so data is inadequate.
Comments
There are no comments.Copyright ©CuriousTab. All rights reserved.