Work for 1 st 2 days = (1/8) + (1/12) = 5/24
? Work for 8 days = (5/24) x (8/2) = 5/6
? Remaining work = 1- (5/6) = (6 - 5) / 6 = 1/6
On 9th day, A's work = 1/8
Remaining work after 9 days = (1/6) - (1/8) = (4 - 3) / 24 = 1/24
B will finish this work in (12 x 1)/24 = 1/2 day
Clearly, A worked for 5 days from starting.
? Work done by A in 5 days = (1/8) x 5 = 5/8
? A's share = (5/8) x 1280 = 5 x 160 = ? 800
47/10000 = .0047
.02 =(2/100) x 100% =2%
Let N / 11 = 233
Then, N = 233 x 11 = 2563
? Missing digit is 5.
121012 = 12 x 10084 + 4
? remainder = 4
We have the important relation, More work, More time (days)
? A piece of work can be done in 6 days.
? Three times of work of same type can be done in 6 x 3
= 18 days
? = 750.0003 ÷ 19.999
? ? ? 750 ÷ 20
? ? ? 375 ? 38
Subtract 20, 25, 30, 35, 40, 45 from successive numbers. So 0 is wrong.