Work for 1 st 2 days = (1/8) + (1/12) = 5/24
? Work for 8 days = (5/24) x (8/2) = 5/6
? Remaining work = 1- (5/6) = (6 - 5) / 6 = 1/6
On 9th day, A's work = 1/8
Remaining work after 9 days = (1/6) - (1/8) = (4 - 3) / 24 = 1/24
B will finish this work in (12 x 1)/24 = 1/2 day
Clearly, A worked for 5 days from starting.
? Work done by A in 5 days = (1/8) x 5 = 5/8
? A's share = (5/8) x 1280 = 5 x 160 = ? 800
n(S) = 6, n(E) = (4, 6) = 2
? P(E) = 2/6 = 1/3
Here, A = ? 8800, T =2 yr, R = 5%
We know
SI = ART/(100 + RT) = (8800 x 5 x 2) / (100 + 5 x 2)
= (8800 x 10) / 110
= ? 800
3rd term = (2nd term) x 3 - 4 = 26 x 3 - 4 = 74.
4th term = (3th term) x 3 - 4 = 74 x 3 - 4 = 218.
5th term = (4th term) x 3 - 4 = 218 x 3 - 4 = 650.
∴ 5th term must be 650 instead of 654.
Other side = ?5 2 - 42
= ? 9
=3 m
So The area of the rectangular field = 4 x 3
= 12 m2
0.27 = (27 - 2)/90 = 25/90 = 5/18
For 50 students, food is sufficient for 45 days
? For 1 student, food is sufficient for 45 x 50 days
and for 75 students, food is sufficient for (45 x 50)/75 days. i,e., for 30 days.