  • The records in a file or magnetic tape


  • Options
  • A. can only be accessed serially
  • B. have to be arranged in a key sequence
  • C. are meant for backup
  • D. cannot be transferred to a disk file
  • E. None of the above

  • Correct Answer
  • can only be accessed serially 


  • System Analysis and Design problems


    Search Results


    • 1. In Prototyping

    • Options
    • A. BASIC is used
    • B. COBOL is used
    • C. 4GLs are used
    • D. system is documented
    • E. None of the above
    • Discuss
    • 2. Decision tree uses

    • Options
    • A. pictorial depictation of alternate conditions
    • B. nodes and branches
    • C. consequences of various depicted alternates
    • D. All of the above
    • E. None of the above
    • Discuss
    • 3. The set of. instructions for how to tie a bow is an example of the _____Structure.

    • Options
    • A. Control
    • B. Repetition
    • C. Selection
    • D. Sequence
    • E. switching
    • Discuss
    • 4. Which of the following is not a factor in the failure of the systems developments projects?

    • Options
    • A. size of the company
    • B. inadequate user involvement
    • C. failure of systems integration
    • D. continuation of a project that should have been cancelled
    • E. None of the above
    • Discuss
    • 5. Data manipulation language (DML)

    • Options
    • A. describes how data are structured in the data base
    • B. specifies for the DBMS what is required; the techniques used to process data
    • C. determine how data must be structured to produce the user's view
    • D. All of the above
    • E. None of the above
    • Discuss
    • 6. A _____ is an outline of a process that keeps develop successful information systems

    • Options
    • A. System Development Life Cycle
    • B. CASE tool
    • C. Phased Conversion
    • D. Success Factors
    • E. Move of the above
    • Discuss
    • 7. In phase 1 of the system development life cycle, which of the following aspects are usually analyzed?

    • Options
    • A. outputs
    • B. input (transactions)
    • C. controls
    • D. All of the above
    • E. None of the above
    • Discuss
    • 8. Managers who are potential users of the MIS

    • Options
    • A. select the optimum equipment configurations
    • B. evaluate alternate equipment configurations
    • C. describe information needs
    • D. All of the above
    • E. None of the above
    • Discuss
    • 9. In a _____ one module of the new information system is activates at a time.

    • Options
    • A. System Development Life Cycle
    • B. CASE tool
    • C. Phased Conversion
    • D. Success factors
    • E. None of the above.
    • Discuss
    • 10. The approach used in top-down analysis and design is

    • Options
    • A. to identify the top level functions by combining many smaller components into a single entity
    • B. to prepare flow charts after programming has been completed
    • C. to identify a top level function an d then create a hierarchy of lower-level modules and components.